BACKUP POWER / NAPERVILLE HOMEOWNER GUIDE

Generators & backup power

Start with the things you need to keep running. Then plan the equipment, fuel and safe separation from the utility.

Reviewed October 4, 2026 · How we source this guide

YOUR STARTING POINT

A generator plan needs a load list, a safe location and professionally designed transfer equipment—not just a generator.

BACKUP POWER / ONE SOURCE AT A TIME

Utility supplyStandby generator
Transfer equipmentSafely selects the source
Selected home loadsAgreed during planning
Conceptual relationship, not a wiring plan. Professional design must isolate the supplies and meet utility requirements.

Portable and standby solve different problems

A portable generator requires manual setup and safe outdoor operation. A standby generator is a fixed installation, typically designed to start automatically during an outage. Neither choice is automatically sized to run every load in the home.

List essential needs: a sump pump, refrigeration, heating controls or necessary medical equipment. Discuss starting loads and realistic runtime with the installer. Medical needs may also require a separate, clinically appropriate backup plan.

Transfer equipment is essential

Transfer equipment prevents the generator and utility supply from improperly energizing each other. Naperville’s utility requires suitable transfer equipment and an outside service disconnect for standby installations. Have the installer confirm the current configuration with the utility. Naperville Electric Utility: generator safety ↗

Never backfeed through a wall outlet. It can energize utility lines and put workers and neighbors at risk. Do not improvise a connection or bypass protective equipment.

Placement and fuel are part of the design

A fixed installation needs manufacturer clearances, exhaust planning, access for service and review of applicable property requirements. Natural-gas service capacity or propane storage may introduce additional work. Ask who coordinates those trades.

Portable generators belong outdoors, at least 20 feet from the home, with exhaust directed away from buildings. Never operate one inside a home, garage or basement. Use working carbon monoxide alarms and follow the manufacturer’s instructions. CPSC: portable generator and heating safety ↗

The local permit step

Naperville requires an issued building permit before construction for generators added to a residential structure. Use the current permit page rather than relying on an old quoted fee. City generator permit ↗

Have the proposal identify the generator, transfer equipment, fuel work, placement plan and inspection responsibilities. Ask whether utility coordination changes the installation schedule.

Compare the complete ownership cost

  • Equipment output and the exact loads supported.
  • Installation, transfer equipment, fuel work and restoration.
  • Startup testing and owner orientation.
  • Routine service, consumables, warranty and remote-monitoring charges.
  • Fuel availability, expected runtime and maintenance access.

A lower purchase price may omit essential installation work. Ask for separate equipment and installation scopes in every estimate.

PUT YOUR RESEARCH TO WORK

Ready to talk to an electrician?

Bring a clear project brief. Verify the contractor’s credentials, then compare what each estimate actually includes.

Choose an electrician ↗Prepare your quote comparison →